Reacon Systems
PRE-ENGINEERED BUILDINGSCONVENTION HALLS
UP TO 60M SPAN500–5000 GUESTS● 5 HALLS DELIVERED

Steel Convention Halls.
Column-free. Built to impress.

Grand convention centres and auditoriums engineered for large gatherings — with premium facades, acoustic panels, and clear-span interiors that look and feel like premium RCC. Delivered 3–4× faster.

Get a Free Quote View Convention Projects
COMPLETED PROJECTS
Hotel Vivera Convention Centre — Narketpally
IIITDM Kurnool — Auditorium
AV Convention Hall — Shadnagar
Classic Conventions — Hyderabad
[ 01 / ENGINEERED FOR GRAND EVENTS ]

Every detail built in from day one.

01Clear spans up to 60m — fully column-free grand halls
02Acoustic roof panels and wall insulation
03Premium facades: ACP, glass curtain, stone-look cladding
04Air-handling and HVAC system integration
05Stage, backstage, and green room structural provisions
06Emergency exit compliant layouts
07Multi-level mezzanine for balcony seating
08Skylight and rainwater harvesting provisions
PADMAJA CONVENTION HALL — HYDERABAD
[ 02 / APPLICATIONS ]

Every gathering type.

01Wedding & Banquet Halls
02Corporate Event Venues
03University Auditoriums
04Exhibition Centres
05Conference Halls
06Temple / Community Halls
07Theatre Spaces
08Hotel Ballrooms
[ 03 / OUR WORK ]

Convention halls we've delivered.

AV Convention Hall, Shadnagar
AV Convention · Shadnagar, Hyderabad
Cocoa Plum Resort
Cocoa Plum Resort · Shadnagar, Hyderabad
Padmaja Convention Hall
Padmaja Convention · Jalpally, Hyderabad
View All Projects
[ WHY STEEL PEB FOR CONVENTION HALLS ]

Why Hyderabad's convention venues are going steel.

Pre-engineered steel construction has become the standard for convention halls and auditoriums across Telangana and Andhra Pradesh — not just because it's faster, but because it solves problems that RCC cannot. Column-free spans up to 60 metres eliminate pillars that obstruct sightlines and seating layouts. Steel's lighter dead load means smaller, cheaper foundations. And unlike concrete, a steel convention hall can be extended, modified, or reconfigured as your business grows.

3–4× faster than RCC

A convention hall that takes 18 months in RCC can be delivered in 14–20 weeks with PEB. Every week saved is earlier revenue from events and bookings.

Column-free interiors

Clear spans up to 60m mean no columns in the middle of your hall. Sightlines stay clear across 5000-guest venues. Flexible seating configurations without structural constraints.

Lower cost of ownership

Steel doesn't crack, settle, or leak like concrete. Maintenance costs are significantly lower over a 30-year lifecycle. And steel holds scrap value — RCC doesn't.

[ HOW WE BUILD ]

From brief to handover — 4 steps.

01
Site & Brief

Share your capacity requirement, plot dimensions, and budget. We assess site conditions and prepare a preliminary layout within 48 hours.

02
Design & Approval

Our structural engineers design the hall to IS code specifications. You review 3D layouts, facade options, and seating plans before fabrication begins.

03
Fabrication

Steel columns, rafters, purlins, and cladding are fabricated at our Medchal plant. Factory production ensures consistent quality and faster site assembly.

04
Erection & Handover

Our erection team assembles the structure on site. Cladding, interiors, and M&E integration complete the build. Handover with structural warranty.

[ 04 / FAQ ]

Common questions.

Related Reading
PEB Convention Hall vs RCC: Cost, Timeline & Which to Choose (2026)
Read the full guide →
OTHER PEB SOLUTIONS BY REACON SYSTEMS
PEB Industrial ShedsPEB WarehousesSteel Commercial BuildingsBadminton Court ShedsAll PEB Products

Planning a convention hall
or auditorium?

ESTIMATE TURNAROUND < 24 hr
SHARE CAPACITY · LOCATION · CONCEPT