80M
MAX CLEAR SPAN
18M
MAX CLEAR HEIGHT
6–12
WEEKS TO HANDOVER
NBC / IS 800
STANDARDS MET
[ 01 / ENGINEERED FOR LOGISTICS ]
Built for operations at scale.
01High clear heights (9m to 18m) for racking systems
02Column-free spans for unobstructed floor operations
03Dock leveller and loading bay integration
04Fire-rated cladding options available
05Rainwater harvesting roof systems
06Insulated sandwich panels for temperature control
07Mezzanine floor provisions
08NBC and IS 800 compliant
PEB STORAGE STRUCTURE — HYDERABAD
[ 02 / WHO WE BUILD FOR ]
Every logistics vertical.
01E-commerce Fulfilment
02FMCG Distribution
03Pharma Warehousing
04Cold Chain Logistics
05Automotive Parts
06Agri-produce Storage
073PL Operators
08Retail Distribution
[ 03 / COST & BUDGETING ]
What a warehouse costs, by tier.
Basic PEB warehouseSingle-skin roofing, no insulation, standard ventilation₹700–900 /sq ft
Standard warehouseDock levellers, mezzanine provision, upgraded ventilation₹900–1,200 /sq ft
Insulated / temperature-controlledSandwich panel roofing and walls, climate control provisions₹1,200–1,600 /sq ft
Cold storage / pharma-gradeFull insulation, specialised cladding, stringent compliance₹1,600+ /sq ft
Actual cost depends on span, height, location, and finish specification. Figures are indicative — request a free custom quote for your exact requirement.
[ 04 / HOW WE BUILD ]
From site visit to handover.
01
Site assessment & design
Plot survey, load requirements, span and height finalised. Structural drawings prepared to IS 800 / NBC standards.
02
Fabrication
Steel components fabricated in-house — columns, beams, trusses — to exact drawing specification.
03
Transport & site prep
Foundation and site work completed in parallel with fabrication to compress the overall timeline.
04
Erection
Structural steel erected on-site, followed by roofing and wall cladding installation.
05
Finishing & handover
Dock levellers, mezzanine, insulation, and fittings completed. Structure handed over ready for operations.
[ 05 / WHY REACON ]
Turnkey, not just fabrication.
18+ years
In continuous PEB manufacturing since 2007 — not a recent entrant to the category.
In-house fabrication
Design, fabrication, and erection managed end-to-end by Reacon — no subcontracted steelwork.
Pan-India delivery
Warehouse projects completed across Telangana, Andhra Pradesh, and other states — our team travels to your site.
Proven at scale
15 Doppler Weather Radar towers built for IMD — precision engineering credentials beyond standard warehouse work.
[ 07 / FAQ ]
Common questions.
PEB warehouse costs range from ₹700–₹1,600 per sq ft depending on clear height, span, insulation, dock requirements, and location. Contact Reacon for a free custom quote with your plot size and height requirement.
Standard PEB warehouse: 6–12 weeks from design approval to handover. That's significantly faster than RCC which takes 9–18 months for the same footprint.
Yes. New bays can be added to ends or sides without demolishing the existing structure — making it easy to scale as your operations grow.
Designed for any floor loading requirement — heavy racking systems, forklift operations, and high-bay storage. Load specs are set during the design phase.
Yes. Reacon offers insulated sandwich panel roofing and walls for temperature-controlled warehouses, cold storage, and pharma distribution centres.
Yes — pan-India. We've completed warehouse projects across Telangana, Andhra Pradesh, and other states. Our team travels to your site.
Standard logistics warehouses are built with 9–12m clear eave height to accommodate multi-level racking and forklift/reach-truck operations. High-bay automated storage warehouses can go higher — clear height is set during design based on your racking and equipment plan.
Yes. Dock leveller pits, canopy overhangs, and loading bay aprons are designed into the foundation and steel frame from the start. Reacon coordinates civil work for dock height, truck turning radius, and leveller installation as part of the turnkey scope.
Related Reading
PEB Warehouse Cost & Construction Guide, Hyderabad (2026)Building for pharma or cold chain? Read our pharma warehouse construction guide.
OTHER PEB SOLUTIONS BY REACON SYSTEMS
